ModelPriceWatch.com
Last scan 2026-08-11 Models tracked 203 Providers 31 Cheapest paid Granite 4.0 Micro $0.017/Mtok in Every price links to its source

Solar Pro 4 vs Granite 4 H Large

Side-by-side comparison of API pricing, specs, benchmarks, and capabilities

Solar Pro 4 is 90% cheaper on blended cost ($0.052 vs $0.525/Mtok)
Specification
Solar Pro 4Intro price
by IBM
Overview
StatusCurrent mid tier Current mid tier Open weights
Released Aug 11, 2026 Oct 19, 2025
Pricing per million tokens
Input $0.030/Mtok $0.300/Mtok
Output $0.120/Mtok $1.20/Mtok
Blended avg $0.052/Mtok $0.525/Mtok
Cached input $0.006/Mtok
Specifications
Context window 524K tokens 128K tokens
Parameters Proprietary Proprietary
Speed (TPS)
Modalities
Input
text
text
Benchmarks sources: public leaderboards / IBM model card
GPQA Diamond 42 vendor
SWE-Bench Verified 20 vendor
Humanity's Last Exam 10 vendor
ARC-AGI 2 8 vendor
AIME 2025 35 vendor
MMMLU 70 vendor
BFCL 52 vendor
HumanEval 75 vendor
MATH 500 55 vendor
Providers
Available from
Upstage — $0.030/$0.120/Mtok
IBM — $0.300/$1.20/Mtok

Cost at scale

1M tokens · 50/50 input/output
Projected cost of Solar Pro 4 vs Granite 4 H Large at increasing token volumes
VolumeSolar Pro 4Granite 4 H LargeSavings
1M tokens $0.05 $0.52 $0.47 (89.5%)
10M tokens $0.53 $5.25 $4.72 (89.9%)
100M tokens $5.25 $52.5 $47.25 (90%)
1000M tokens $52.5 $525 $472.5 (90%)

When to pick which

distilled from the pricing and spec data above
Pick Solar Pro 4 if…
  • cost dominates: $0.052/Mtok blended vs $0.525 — 90% less on the same 50/50 token mix
  • your workload re-reads context (agents, RAG, long chats): cached input costs $0.006/Mtok — 80% off its list input price, a discount Granite 4 H Large doesn't offer
  • you need the longer context: 524K tokens vs 128K (4.1×)
Pick Granite 4 H Large if…
  • you want open weights — self-host it, fine-tune it, or exit the API entirely; Solar Pro 4 is closed

Summary

Solar Pro 4 by Upstage costs $0.030/Mtok input and $0.120/Mtok output, with a 524K-token context window. It supports text input.

Granite 4 H Large by IBM costs $0.300/Mtok input and $1.20/Mtok output, with a 128K-token context window. It supports text input.

On a blended cost basis, Solar Pro 4 is 90% cheaper than Granite 4 H Large.It also has a larger context window.

Note: Pricing is per million tokens. Actual costs vary with usage patterns, prompt caching, and batch discounts. Always verify against official provider pricing pages.

More comparisons

pairs sharing a model with this page